Today Dave Fox and his crew finished up the work on 8 pond. Club President, Mark O’Neil, has been out to the project daily since the project started. As the contractor extracts equipment from the area he will add soil and grade his way back to the old garage. Once that has dried out i will come back in with our seed-a-vator and overseed the equipment trail. My staff and I will be responsible for “chinking” in along the top of the stone bank with smaller stone to fill any gaps, then feather in along the edge of the stone with soil. Our staff will still have some cleanup from the pond itself but once cleaned out number 8 will look like a brand new hole. A special thanks to our President for his vision on this project and the board for making this happen.
Great job at all levels from conception to completion!
Looking good! Definitely a major improvement over the existing bulkhead.
Aesthetically they need to blend it back I hope. It definitely needs to be tapered into grass. The rock looks like they just threw it down. Even if they tracked it in with the excavator would help
Sent from Yahoo Mail on Android
I hate this hole and all the distance between me and the cup. However I like what you are doing
505 guess who?
will look even better when #6 and #7 use similar rock and blend all in – future plan !